M3KSoft. Download
← Back to all software
M3K Project View · schedule viewer

Open a schedule without Microsoft Project.

A Microsoft Project file viewer for Windows. It shows the Gantt chart with the critical path, resource usage and calendars, prints them and saves them to PDF — and it needs neither Project nor Java installed. It only reads your files, never changes them.

Windows 10/11 (64-bit)  ·  free  ·  version 0.4.0  ·  installs without admin rights  ·  English and Czech

Gantt chart of a construction schedule in M3K Project View
Gantt chart: critical path in red, links between tasks, baseline, milestones and progress.
MPP, MPT, XML, MPX, MPD
Colour by resource, plus links
Resource usage and overallocation
Print, PDF, Excel and PNG
Features

Everything you need to read from a schedule

The program exists so that anyone can open a schedule — on site, in the office or at a client, without a Project licence.

Gantt chart

Bars with progress, summaries, milestones, split tasks and FS/SS/FF/SF links. Critical path in red, baseline, deadlines, float, the today line and the status date.

Colours showing who does what

Bars can be coloured by resource, outline level, task type or any custom field from the file — so you see at a glance where each subcontractor works. The legend is drawn below the chart and goes into PDF and print too; critical tasks keep their red outline.

The table your way

Over fifty columns grouped by category, plus the custom fields from your own file (Text1, Number1, Outline Code…). The program remembers your choice of columns, their order, widths and sorting.

Search and filters

Quick filters for critical, delayed or in-progress tasks, and an advanced filter by resource, period, percentage complete or text in a column. Filters can be saved under a name.

Resource usage

A resource × week table with work hours or percentage allocation. Overallocation against the calendar capacity is highlighted in red, and you immediately see which task caused it.

Calendars and deadlines

Working week, holidays and exception shifts in a monthly grid; non-working days are drawn accordingly in the chart. Task details show constraints, deadlines, float and every baseline.

Printing and export

Printing with pagination and a repeated header, PDF in A4 and A3, an XLSX workbook with sheets for tasks, resources, assignments and usage, CSV, and the chart or timeline as PNG.

Schedule quality check

Fourteen DCMA-style checks: tasks without links, hard constraints, negative and excessive float, long durations, lags in links or slippage against the status date. Each finding lists the affected tasks and the summary exports to CSV.

Comparing two versions

Open a new revision and pick the older one. The program matches tasks by ID, WBS and name, then shows what was added, removed or renamed, and by how many days the start or finish moved.

Specifications

What you will need

Supported formatsMPP, MPT (Project 98–2021/365)
XML (MSPDI), MPX, MPD
SystemWindows 10 / 11, 64-bit
Javanot needed, bundled with the package
Installationfor the signed-in user,
no admin rights
LanguageEnglish / Czech
Licencefreeware — free for companies too
Your filesthe program only reads them
Internetthe program never connects anywhere
New in version 0.4.0bar colouring by resource or custom field,
schedule quality check, version comparison, Excel export

Download

Version 0.4.0  ·  17 September 2026  ·  Windows 10/11 (64-bit)  ·  free

Windows installer

The recommended option. Installs just for you and needs no admin rights.

SHA-256: 8e1393f47f538217e77c23ecd042706abb0cb80a39438d81397df850b97e9db7

46 MB Download

Portable version (ZIP)

No installation — unpack and run, for example from a company drive or a USB stick.

SHA-256: bf417f0929a42f4c268e9257493a2238fcbcd6646ba2da21399ab18438451165

54 MB Download ZIP

MSI package for administrators

For mass deployment through Intune, SCCM or group policy; installs for all users.

SHA-256: 4c0cf25d4a3ba1980eb881aa7a6ceaf77f6f142d9d7d8599fe4f914f40ba7c81

55 MB Download MSI

Windows says “Unknown publisher”?

The installer does not have a purchased signing certificate yet, so SmartScreen warns that it does not recognise the publisher — this is not a virus detection. Click More info → Run anyway, or first verify the SHA-256 checksum with certutil -hashfile file.exe SHA256 and compare it with the value listed above.

The program is freeware: free to use and to pass on unchanged, for private and commercial purposes alike. Neither the installer nor the program is signed with a certificate — Windows may therefore show an “Unknown publisher” warning when you download it and when you first run it (the box above explains how to get past it). It is provided without warranty; the original file is always the authoritative source. Found a bug or missing something? Write to info@m3ksound.cz.